Contract for S7 already signed

On Monday, January 8th, the contract for the construction of the S7 road located in the north of Krakow was signed (part II Szczepanowice node-Widoma node). The contractor for the investment is Mota-Engil Central Europe S.A. The ceremony was attended by the Minister of Infrastructure and Construction, Mr. Andrzej Adamczyk.

The S7 expressway is created to improve traffic in the north-south direction of Poland. It will directly connect Gdańsk, Warsaw and Kraków. The construction of the S7 expressway will shorten travel time, increase traffic capacity and traffic flow, improve traffic safety and improve the living conditions of residents of towns located in the vicinity of an existing road.

The scope of investment includes:
• implementation of a dual carriageway expressway,
• construction of road interchanges,
• construction of engineering structures within the planned expressway and along roads crossing,
• construction of drainage elements for roads and associated facilities,
• construction of access roads,
• construction of traffic safety devices,
• implementation of solutions resulting from the environment,
• removing collisions with existing objects,
• translating fragments of watercourses colliding with the S7 road,
• construction of technical infrastructure and technological channels.

Leave a Reply

Your email address will not be published. Required fields are marked *

nineteen + nineteen =

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>